Project Overview
The project comprises 19 levels above ground and a single basement. Car park levels are above and below ground, with some 15 levels of residential living above. There is a 25 metre lap pool at Level 3. The building has balcony slabs to progressively cantilever out and then back in, throughout the entire height of the building
Form 700 Scope
Our role entailed all the works involved in building the concrete structure; supplying and erecting formwork; supply and fix reinforcement; supply, pump, place and finish concrete; supply of Form700 Self-Climbing Core Systems and Form700 Self-Climbing Perimeter Safety Screens.
430 St Kilda Rd, Melbourne, Vic
$65 Million
2008-2009